Construction Technology::All about civil construction.: METHODOLOGY FOR STRESSING OF PSC GIRDERS
Construction Technology::All about civil construction.: METHODOLOGY FOR STRESSING OF PSC GIRDERS: UNCOILING OF H.T.STRANDS : This operation is to be carried out on an elevated platform to prevent soiling of strands. The coil should be...
Construction Technology::All about civil construction.: AVOIDING COMMON CONCRETING PROBLEMS
Construction Technology::All about civil construction.: AVOIDING COMMON CONCRETING PROBLEMS: There are a number of problems which can occur in concrete as a result of improper mixing, placing, or curing. The following are common pr...
Construction Technology::All about civil construction.: Tests on Cement at Construction Site To Check Qual...
Construction Technology::All about civil construction.: Tests on Cement at Construction Site To Check Qual...: Quality tests on cements at construction site (also called field tests on cement) are carried to know the quality of cement supplied ...
Construction Technology::All about civil construction.: TYPES OF TESTS ON BRICKS FOR BUILDING CONSTRUCTION...
Construction Technology::All about civil construction.: TYPES OF TESTS ON BRICKS FOR BUILDING CONSTRUCTION...: Various types of tests on bricks are conducted to check the qualities of bricks for construction purposes. Tests on bricks are conduc...
Construction Technology::All about civil construction.: What is difference between density & specific grav...
Construction Technology::All about civil construction.: What is difference between density & specific grav...: Density is defined as amount of matter per unit volume. This means in a given space , how much mass or simply a matter occupy space. Densi...
Wednesday, October 3, 2018
METHODOLOGY FOR STRESSING OF PSC GIRDERS
UNCOILING OF H.T.STRANDS :
This operation is to be carried out on an elevated platform to prevent soiling of strands. The coil should be bound by pipes & couplers to ensure no sudden release of internal pressure in the coil. The strand shall be uncoiled layer by layer to prevent flying off of strands from the coil. Atmost caution shall be exercised while decoiling operations are in progress and no personnel/Labour shall be allowed to move in the area around the coil.
CUTTING OF STRANDS :
The uncoiled strands shall be laid on the elevated platform and cut to size as per the execution drawings. The cutting of strands shall be done only by abrasive cutter and no gas cutting shall be allowed. The length of the cable as given in the execution drawings shall be verified as to whether it includes the gripping length of 750mm on either side of the girder in case of both end stressing of cables is being done. For one end stressing 750mm extra on the stressing end & 250mm for dead end of the girder should be provided.
MAKING AND MARKING CABLES OUT OF CUT STRANDS :
The strands shall not be moved from the elevated platform till they are attached with tags bearing the specific cable nos. The cables shall be formed by tying the strands with binding wire at a distance centre to centre as necessary for the entire length of the cable.
FIXING OF GUIDE CONES :
The guide cone shall be fixed with the grout hole on the topside of the cone. The cable arrangement as per the drawing shall be maintained while fixing the cones. The sheathing shall be properly fixed into the mouth of the guide cone by properly turning the sheathing into the grooves meant for the purpose.
PROFILING OF SHEATHING :
The sheathing shall be profiled with the help of jigs. The jigs are to be prepared of 16mm dia reinforcement bars and shall be fixed @ 1000 mm c/c by tying firmly with the reinforcement. It is preferable to weld the supporting bars with reinforcement cage of the girder after the profiling of the cables is checked and approved.
THREADING OF STRANDS :
The cables prepared on the elevated platform shall be then brought to site carefully. The cable end tied with binding wire and then wrapped (at the tip) with PVC tapes shall be introduced into the duct from one end of the guide cone. Care shall be taken while threading the cables not to puncture the sheathing at any location.
CONCRETING OF GIRDER :
The girder may be cast with either pre threaded ducts or post threaded ducts.
a) Pre threaded:
The girder shall be concreted after the cables are introduced and strand ends are enclosed in gunny bags as protection. The cables shall be moved back and forth until concreting is completed to ensure free movement of strands. This will prevent any slurry from setting inside the sheathing and blocking the ducts. If there is a doubt of any blockage, the duct shall be flushed with water and subsequently with compressed air. Concrete cubes have to be taken (at least two sets per girder-set comprising of 6 cubes for the same batch) and marked to identify girder no. / Date of casting etc. During pouring of concrete care should be taken not to pour concrete directly on the tube units or the brusting reinforcements and careful observation should be made to ensure no pocket formation anywhere. Shutter vibrator and needle vibrator have to be operated properly.
b) Post threaded:
Provide a H.D.P.E. pipe of suitable diameter through the duct. During concreting this pipe is push back & forth to ensure no blockage in the duct. In this method threading is done just before pre stressing activity is taken up.
Before the stressing operations are undertaken following things have to be checked:
1. Check the correct functioning of jacks, Power pack pumps and leads.
2. Re-establish the modulus of elasticity of H. T. strands from the particular lot to be used from an approved laboratory. Re calculate and modify the elongation of strands, corresponding to the modulers of elasticity and section area for the particular lot of strand to be used for stressing.
3. Move the cables inside the duct to ensure pressure in the duct.
4. Clean the strands thoroughly to ensure no rusting on the strands in the gripping area at the permanent wedge location and master grip area to ensure this a length of strands protruding out from the face of the tube unit and length of 300mm inside the duct should be cleaned with wire brush and petrol to remove all the dirts, grease, oil etc. from the surface of the strands.
5. Wedges and bearing plates are inspected visually and cleaned thoroughly with Nylon wire brushing and petrol to remove all dirts, grease etc. from surface of the female parts of the bearing plates and serretions of wedges.
6. Wire brushing is not recommended for cleaning of wedges. We should use Nylon bristled brush.
THREADING OF BEARING PLATES AND JACKS:
On the attainment of strength of concrete as determined by cube crushing strength as specified by the consultant steps are taken to take up stressing.
Ø A tripod / stand or scaffolding is erected on each end of the girder to hang the prestressing jacks with the help of 3 to 5 Ton. chain pulley block in position. Height of scaffolding / tripod should be such to provide sufficient driving of the jack to thread the strands into the jack difficulties. Specific bearing plates duly cleaned are threaded with the strands.
Ø Cleaned Grips are threaded into the groove of the bearing plates.
Ø It is to be observed that strands in the area of gripping are cleaned.
STRESSING :
The power pack is supplied with 3 phase Power supply and it is connected to the jack. Now at both ends of the girder stressing is done simultaneously. The pressure is increased up to 50 kg/cm2 and halted. At this stage initial slackness is removed. Subsequently elongation at an interval of every 50 kg/cm2 is noted down. Zero correction is done and total elongation is calculated. Slip after 24 hours is also recorded by making a mark on the cable at 100 mm from the face of girder. The cables are cut from a distance of 50 mm from the wedges and grout cap is bolted.
SPECIAL NOTE DURING TRANSFER OF PRESTRESSING FORCE:
The transfer of the prestressing force shall be carried out gradually. Since sudden application of stress may result in severe eccentricities of Prestressing force in the concrete. This will also ensure transfer of prestress to the concrete is uniform along the length of the tension line.
CABLE AND STRESSING PREPARATION SHEET :
Before a cable is stressed, Cable and Stressing preparation sheet is updated. This sheet involves girder no., cable no., length of cable etc. Theoretical "E" value (assumed Young's modulus during design) and theoretical "A" value (assumed area of the cable during design) are entered into the sheet. Actual "E" and actual "A" value can be obtained from the strand manufacture's test certificate. Theoretical elongation & theoretical jacking force (obtained from the drawings) are updated. Jack efficiency and Jack ram area can be obtained from the Jack test certificates. Modified elongation and modified jacking force are computed as per the formulae given in the sheet. Finally jacking pressure is computed as per the modified elongation.
STRESSING READINGS SHEET:
While a cable is stressed the stress readings are entered into this sheet. From this total elongation is computed. The clients should authorize this sheet.The total tension imparted to each tendon shall conform to the design requirements and modified values based on the calculation. Initial slack in Prestressing tendons may be removed by applying small initial tension.
If the calculated elongation is reached before the specified gauge pressure, continue tensioning till attaining the specified gauge pressure provided the elongation does not exceed 1.05 times the calculated elongation. If 1.05 times the calculated elongation is reached before the specified gauge pressure is attained. Stop stressing and note the readings as per the charts.
If the calculated elongation has not reached at the specified gauge pressure, continue tensioning by intervals of 5kg/sqcm of gauge pressure until the calculated elongation is reached restricted to the upper limit of gauge pressure 1.05 times the specified gauge pressure.
LOCK OFF PRESSURE :
Lock of pressure should be in the order of 2/3rd of the stressing pressure. In case wedge set is found to be more than 6mm the lock off pressure may be increased by another maximum 10kg/cm2. In no case lock off pressure is more than 280kg/cm2. in case by increase of lock off pressure wedge sets did not improve. One has to take more care regarding cleaning of strands, wedges etc. before taking up the pre-stressing work.
TESTING OF JACKS AND PUMPS:
1. Interconnect the corresponding lines of both EOHP power pack and start one power pack to read corresponding gauge pressure on the others. If the gauge pressure are found to be same then go for the Jack test.
2. Put the jack face to face and fit the jack in line. Thread the strands of suitable length to grip on to the strands at the end of the jack. Give the initial movement to jack ram upto 50mm for both the jack and fix master grips on both jacks. The system is ready for efficiency test.
One Jack is first made active and increase the jack pressure @ intervals of 50Kg/sqcm and note the readings on the other jack pressure provide upto 85%of the U.T.S. of the strands work out the efficiency. Now the other jack is made active and former one is made passive and repeat the test and work out the efficiency. Average of these readings will give the efficiency of the jacks.
Comprehensive Design Example for Prestressed Concrete (PSC) Girder Superstructure Bridge Design Step 5 Design of Superstructure
Design Step 5.6 - Flexure Design
Design Step 5.6.1 - Flexural stress at transfer
Design Step 5.6.1.1 - Stress limits at transfer
Compression stress:The allowable compression stress limit for pretensioned concrete components is calculated according to S5.9.4.1.1.
fCompression | = -0.60(f′ci) = -0.60(4.8 ksi) = -2.88 ksi |
From Table S5.9.4.1.2-1, the stress limit in areas with bonded reinforcement sufficient to resist 120% of the tension force in the cracked concrete computed on the basis of an uncracked section is calculated as:
ftension | = 0.48 ksi |
Design Step 5.6.1.2 - Stress calculations at transfer
Table 5.6-1 - Stresses at Top and Bottom of Beam at Transfer
Sample Calculations for Flexural Stresses at TransferDefinitions:
Sample Calculations at 1 ft. - 9 in. From CL of Bearing (2 ft. - 6 in. From Girder End)Girder top stress:
Sample Calculations at 11 ft. From the CL of Bearing (11 ft. - 9 in. From Girder End)Girder top stress:
Sample Calculations at 54 ft. - 6 in. From the CL of Bearing (55 ft. - 3 in. From Girder End) - Midspan of Noncomposite BeamGirder top stress:
Design Step 5.6.2 - Final flexural stress under Service I limit stateMaximum compression is checked under Service I limit state and maximum tension is checked under Service III limit state. The difference between Service I and Service III limit states is that Service I has a load factor of 1.0 for live load while Service III has a load factor of 0.8.As indicated in Section 5.3, many jurisdictions do not include creep and shrinkage effects in designing a pretensioned girder bridge. The calculations presented herein do not include creep and shrinkage moments. If creep and shrinkage are required by a specific jurisdiction, then their effects should be included. See Section 5.3 and Appendix C for calculations and values of creep and shrinkage effects for the example bridge. Design Step 5.6.2.1 - Stress limitsCompression stress:From Table S5.9.4.2.1-1, the stress limit due to the sum of the effective prestress, permanent loads, and transient loads and during shipping and handling is taken as 0.6φwf′c (whereφw is equal to 1.0 for solid sections).For prestressed concrete beams (f′c = 6.0 ksi) fComp, beam1 = -0.6(6.0 ksi) = -3.6 ksiFor deck slab (f′c = 4.0 ksi)
Tension stress:From Table S5.9.4.2.2-1, the stress limit in prestressed concrete at the service limit state after losses for fully prestressed components in bridges other than segmentally constructed, which include bonded prestressing tendons and are subjected to not worse than moderate corrosion conditions shall be taken as the following:
Table 5.6-2 - Stresses in the Prestressed Beam
Table 5.6-2 - Stresses in the Prestressed Beam (cont.)
Design Step 5.6.2.2Sample Calculations at 11 ft. From the CL of Bearing (11 ft. - 9 in. From Girder End)Girder top stress after losses under sum of all loads (Service I):
Girder bottom stress under prestressing and dead load after losses:
Sample Calculations at 54 ft. - 6 in. From the CL of Bearing (55 ft. - 3 in. From Girder End) - Midspan of Noncomposite GirderGirder top stress after losses under sum of all loads (Service I):
Girder bottom stress after losses under prestress and dead load:
Sections in the negative moment region may crack under service limit state loading due to high negative composite dead and live loads. The cracking starts in the deck and as the loads increase the cracks extend downward into the beam. The location of the neutral axis for a section subject to external moments causing compressive stress at the side where the prestressing force is located may be determined using a trial and error approach as follows:
Sample Calculations for a Section in the Negative Moment Region Under Service Limit State, Section at 107 ft. - 3 in. From the CL of End Bearing (108 ft. From Girder End)From Table 5.3-1,
Referring to Figure 5.6-1:Assume neutral axis at 32.5 inches from the bottom of beamAssume maximum concrete compressive strain = 0.00079 in./in. Tensile strain in deck reinforcement = 0.00079(75.52 - 32.5)/32.5 = 0.001046 in./in. Modulus of elasticity of concrete beam = 4,696 ksi (see Section 2) Concrete stress at bottom of beam = 0.00079(4,696) = 3.71 ksi Area of deck longitudinal reinforcement = 14.65 in2 (see Section 5.6.5.1 for calculation) Force in deck steel = 14.65(0.001046)(29,000) = 444.4 k Force in prestressing steel = 797.2 k (see Table 5.5-1) Compressive forces in the concrete: Considering Figure 5.6-1, by calculating the forces acting on different areas as the volume of the stress blocks for areas A1, A2 and A3 as the volume of a wedge, prism or pyramid, as appropriate, the forces in Table 5.6-3 may be calculated. Recall that the centers of gravity of a wedge, a prism with all rectangular faces, a prism with a triangular vertical face and a pyramid are at one-third, one-half, one-third and one-quarter the height, respectively. The location of the centers of gravity shown in the figure may also be calculated. The moment from internal compressive concrete forces shown in Table 5.6-3 is equal to the force multiplied by the distance from the neutral axis to the location of the force.
Table 5.6-3 - Forces in Concrete Under Service Load in Negative Moment Regions (Section at 107'-3" from the end bearing)
Sample force calculations for area A3.Two components of stress act on area A3. The first component is a rectangular stress distribution with an intensity of 1.66 ksi. The second component is a triangular stress distribution with an intensity of 1.14 ksi.Force due to the rectangular stress distribution:
The volume used to determine the effect of the triangular stress distribution is calculated using geometry of a pyramid.
Check force equilibrium:
Check moment equilibrium:
The calculated stress equals 3.71 ksi or is 3% overstressed. However, as explained above, the stress in the prestressing steel should decrease due to compressive strains in the concrete caused by external loads, i.e., prestressing steel force less than 797.2 k and the actual stress is expected to be lower than the calculated stress, and the above difference (3%) is considered within the acceptable tolerance. Notice that the above calculations may be repeated for other cases of loading in Table S5.9.4.2.1-1 and the resulting applied stress is compared to the respective stress limit. However, the case of all loads applied typically controls. Design Step 5.6.3 - Longitudinal steel at top of girderThe tensile stress limit at transfer used in this example requires the use of steel at the tension side of the beam to resist at least 120% of the tensile stress in the concrete calculated based on an uncracked section (Table S5.9.4.1.2-1). The sample calculations are shown for the section in Table 5.6-1 with the highest tensile stress at transfer, i.e., the section at 1.75 ft. from the centerline of the end bearing.By integrating the tensile stress in Figure 5.6-2 over the corresponding area of the beam, the tensile force may be calculated as:
Use 8 #5 bars as shown in Figure 5.6-3 Figure 5.6-2 - Stress at Location of Maximum Tensile Stress at Transfer Figure 5.6-3 - Longitudinal Reinforcement of Girder Top Flange Design Step 5.6.4 - Flexural resistance at the strength limit state in positive moment region (S5.7.3.1)Sample calculations at midspan
Factored flexural resistance in flanged sections (S5.7.3.2.2) Mn = Apsfps(dp - a/2) + Asfy(ds - a/2) - A′sf′y(d′s - a/2) + 0.85f′c(b - bw)β1hf(a/2 - hf/2) (S5.7.3.2.2-1)The definition of the variables in the above equation and their values for this example are as follows:
Substituting,
Mr = φMn (S5.7.3.2.1-1) where:The maximum factored applied moment for Strength I limit state is 8,456 k-ft (see Table 5.3-2) Mr = 10,697 k-ft > Mu = 8,456 k-ft OK Design Step 5.6.4.1 - Check if section is over-reinforcedLimits for reinforcing (S5.7.3.3)The maximum amount of prestressed and nonprestressed reinforcement must be such that:
Design Step 5.6.4.2 - Check minimum required reinforcement (S5.7.3.3.2)Critical location is at the midspan of the continuous span = 55 ft. from the end bearing.All strands are fully bonded at this location. According to S5.7.3.3.2, unless otherwise specified, at any section of a flexural component, the amount of prestressed and nonprestressed tensile reinforcement shall be adequate to develop a factored flexural resistance, Mr, at least equal to the lesser of: 1.2 times the cracking strength determined on the basis of elastic stress distribution and the modulus of rupture, fr, on the concrete as specified in S5.4.2.6.The cracking moment, Mcr, is calculated as the total moment acting on the beam when the maximum tensile stress equals the modulus of rupture. fr = -Pt/Ag - Pte/Sb + MDNC/Sb + MDC/Sbc + M/Sbc
Solving for M, the additional moment required to cause cracking, in this equation:
1.33(8,456) = 11,246 k-ftMr has to be greater than the lesser of 1.2Mcr and 1.33Mu, i.e.,7,472 k-ft. Mr also has to be greater than the applied factored load Mu = 8,456 k-ft (strength requirement) Mr = 10,697 k-ft, therefore, both provisions are OK Design Step 5.6.5 - Continuity connection at intermediate supportDesign Step 5.6.5.1 - Negative moment connection at the Strength limit stateDetermine the deck steel at the intermediate pier.Based on preliminary calculations, the top and bottom longitudinal reinforcement of the deck are assumed to be #6 bars at 5.5 in. spacing and #6 bars at 8.5 in. spacing, respectively (see Figure 5.6-5). Calculate the total area of steel per unit width of slab:
Assume the neutral axis is in the bottom flange (rectangular behavior), therefore,
c = Asfy/0.85β1f′cb (S5.7.3.1.1-4, modified)
Mn = Asfy(ds - a/2)
Mr = φfMn (S5.7.3.2.1-1)
Check moment capacity versus the maximum applied factored moment at the critical locationCritical location is at the centerline of pier.Strength I limit state controls. |Mu| = 4,729 k-ft (see Table 5.3-2) < Mr = 4,775 k-ft OK Check service crack control (S5.5.2)Actions to be considered at the service limit state are cracking, deformations, and concrete stresses, as specified in Articles S5.7.3.4, S5.7.3.6, and S5.9.4, respectively. The cracking stress is taken as the modulus of rupture specified in S5.4.2.6.Components shall be so proportioned that the tensile stress in the mild steel reinforcement at the service limit state does not exceed fsa, determined as: fsa = Z/(dcA)1/3 ≤ 0.6fy = 0.6(60) = 36 ksi where: Figure 5.6-4 - Dimensions for Calculation of the Area, A
Maximum service stress in the steel = 33.74 ksi < 36 ksi OK Design Step 5.6.5.2 - Positive moment connectionFor jurisdictions that consider creep and shrinkage in the design, it is likely that positive moment will develop at intermediate piers under the effect of prestressing, permanent loads and creep and shrinkage. These jurisdictions provide reinforcement at the bottom of the beams at intermediate diaphragms to resist the factored positive moment at these locations.For jurisdictions that do not consider creep and shrinkage in the design, it is unlikely that live load positive moments at intermediate supports will exceed the negative moments from composite permanent loads at these locations. This suggests that there is no need for the positive moment connection. However, in recognition of the presence of creep and shrinkage effects, most jurisdictions specify some reinforcement to resist positive moments. Two forms of the connection have been in use:
Design Step 5.6.6 - Fatigue in prestressed steel (S5.5.3)Article S5.5.3 states that fatigue need not be checked when the maximum tensile stress in the concrete under Service III limit state is taken according to the stress limits of Table S5.9.4.2.2-1. The stress limit in this table was used in this example and, therefore, fatigue of the prestressing steel need not be checked.Design Step 5.6.7 - Camber (S5.7.3.6)The provisions of S2.5.2.6 shall be considered.Deflection and camber calculations shall consider dead load, live load, prestressing, erection loads, concrete creep and shrinkage, and steel relaxation. For determining deflection and camber, the provisions of Articles S4.5.2.1, S4.5.2.2, and S5.9.5.5 shall apply. Instantaneous deflections are computed using the modulus of elasticity for concrete as specified in S5.4.2.4 and taking the gross moment of inertia, Ig,as allowed by S5.7.3.6.2. Deflection values are computed based on prestressing, girder self-weight, slab, formwork, exterior diaphragm weight, and superimposed dead load weight. Camber values are computed based on initial camber, initial camber adjusted for creep, and final camber. Typically, these calculations are conducted using a computer program. Detailed calculations are presented below. Deflection due to initial prestressing is computed as: ΔP/S = -(PtesL2)/(8EciIg) (for straight bonded strands)The negative sign indicates upward deflection. Computer software is generally used to determine the deflections due to each loading. However, sample calculations are provided for this example. See Table 5.5-1 for prestressing forces.
Distance from the bottom of the beam to the centroid of Group 1 strands = 5.375 in. Deflection due to Group 1 strands:
Deflection due to Group 2 strands:
Deflection due to Group 3 strands:
Using conventional beam theory to determine deflection of simple span beams under uniform load or concentrated loads and using the loads calculated in Section 5.2, using noncomposite and composite girder properties for loads applied before and after the slab is hardened, respectively, the following deflections may be calculated:
Design Step 5.6.7.1 - Camber to determine bridge seat elevationsInitial camber, Ci:
In order to determine kc, the volume-to-surface area ratio needs to be calculated. See Figure 2-3 for girder dimensions.Therefore, the initial camber, CiA is:
Design Step 5.6.7.2 - Haunch thicknessThe haunch thickness is varied along the length of the girders to provide the required roadway elevation. For this example, the roadway grade is assumed to be 0.0. Therefore, the difference between the maximum haunch thickness at the support and the minimum haunch thickness at the center of the beam should equal the final camber, i.e., 1.79 in. in this example. Minimum haunch thickness is not included in the specifications and is typically specified by the bridge owner. Figure 5.6-9 shows schematically the variation in haunch thickness. Haunch thickness at intermediate points is typically calculated using a computer program.Design Step 5.6.7.3 - Camber to determine probable sag in bridgeTo eliminate the possibility of sag in the bridge under permanent loads, some jurisdictions require that the above calculations for CF be repeated assuming a further reduction in the initial P/S camber. The final CF value after this reduction should show upward deflection.Design Step 5.6.8 - Optional live load deflection checkService load deformations may cause deterioration of wearing surfaces and local cracking in concrete slabs and in metal bridges which could impair serviceability and durability, even if self limiting and not a potential source of collapse.As early as 1905, attempts were made to avoid these effects by limiting the depth-to-span ratios of trusses and girders, and starting in the 1930's, live load deflection limits were prescribed for the same purpose. In a study of deflection limitations of bridges ASCE (1958), an ASCE committee, found numerous shortcomings in these traditional approaches and noted them. For example: "The limited survey conducted by the Committee revealed no evidence of serious structural damage that could be attributed to excessive deflection. The few examples of damaged stringer connections or cracked concrete floors could probably be corrected more effectively by changes in design than by more restrictive limitations on deflection. On the other hand, both the historical study and the results from the survey indicate clearly that unfavorable psychological reaction to bridge deflection is probably the most frequent and important source of concern regarding the flexibility of bridges. However, those characteristics of bridge vibration which are considered objectionable by pedestrians or passengers in vehicles cannot yet be defined."Since that time, there has been extensive research on human response to motion, and it is now generally agreed that the primary factor affecting human sensitivity is acceleration as opposed to deflection, velocity, or the rate of change of acceleration for bridge structures, but the problem is a difficult subjective one. Thus, to this point in history there are no simple definitive guidelines for the limits of tolerable static deflection or dynamic motion. Among current specifications, the Ontario Highway Bridge Design Code of 1983 contains the most comprehensive provisions regarding vibrations tolerable to humans. The deflection criteria in S2.5.2.6.2 is considered optional. The bridge owner may select to invoke this criteria if desired. If an Owner chooses to invoke deflection control, the following principles may apply:
110(12)/800 = 1.65 in.The calculated live load deflection determined by using computer software is 0.324 in. 0.324 in. < 1.65 in. OK |